Understanding the CCS Project Life Cycle

August 7, 2023

Carbon Capture Storage Sequestration SCS Engineers
Lower your carbon footprint with the help of this SCS educational video series.

 

Carbon capture and storage (CCS) enables industry and manufacturing to reduce greenhouse gas footprints by up to 2 million metric tons annually, for decades. It’s a great time to learn how this technology works, how it can help you, and what the overall lifecycle of a CCS project looks like. In this chapter, Kacey Garber and Candy Elliot step through best practices based on project experience, regulations (in this example Illinois), and the compilation and submittal of permit applications. You’ll learn about:

  • The CCS project life cycle.
  • Key considerations and best practices at each step in the project process.
  • Overcoming common challenges.

Your business does not have to be in Illinois to learn from these educational, non-commercial webinars. Transform how industry leaders like you manage greenhouse gas as a byproduct of modern life.

 

Click to watch The Components of a CCS Project – Permitting, Engineering, Operating, Monitoring to Closure

 

Helpful Basic Tips:

Early planning and mindful project scoping are critical for a CCS project to understand and communicate the project’s needs, objectives, goals, and conceptualized design. Use site characterization data and have a good handle on the operational parameters to develop a good first model and initial area of review delineation. The monitoring system design should then be tailored based on those data. Use the baseline and operational monitoring data to calibrate the model and refine your area of review delineation.

Early financial planning is also important and should include long-term operations and monitoring. Spend rates will be variable throughout these projects and highly dependent on the project’s phase.

The site geology is a key factor — we highly recommend conducting a feasibility study before beginning a project to assess the suitability of Class 6 injection at the proposed location. In addition, when the permit process begins, it’s important to front-load the site characterization efforts to minimize the uncertainty surrounding your site suitability.

Proactive stakeholder engagement surrounding your project is more likely to help lead your project to success. Developing outreach plans help open and facilitate lines of communication with stakeholders, regulatory officials, and public and environmental advocate groups.

Use an iterative project approach – permitting is not a cookie-cutter but a site-specific process. Your early and thorough planning steps help create a feedback loop that will go on throughout the project’s life. It enables flexibility in implementing your approach.

 

Kacey GarberKacey Garber is an experienced groundwater project manager for active and closed industrial clients, including routine groundwater monitoring and statistical analyses; reports and permit applications; designing sampling and analysis plans; special groundwater studies; and conducting groundwater well construction planning and design. She has also been involved in PFAS work groups and publishes on the topics of UIC and geologic sequestration. Ms. Garber has a Masters degree in Geoscience.

Candy ElliottCandy Elliott has 14 years of experience in assessment and remediation, including comprehensive geologic and hydrogeologic site assessments in several states. Her projects include site characterization, site assessment and remediation, brownfields, groundwater monitoring and reporting, groundwater corrective action, mining, and other industrial facility or site development projects. She also supports new and existing geologic permitting assignments for waste clients and facilities. Ms. Elliott is a licensed Professional Geologist.

 

 

Posted by Diane Samuels at 6:00 am