storm water pollution prevention plan

September 28, 2017

If your company stores oil-based inks and manages them as part of your facility’s Spill Prevention, Control and Countermeasures (SPCC) Plan, it may be feasible to use an impracticability determination as an alternative approach to comply.

Read the article by Chris Jimieson of SCS Engineers.

The high viscosity of oil-based inks can provide an opportunity for an alternative means of complying with the secondary containment requirements of the SPCC Rule. An impracticability determination can be an appropriate option for oil-based ink you store in single walled containers at  print or similar facilities.

 

SPCC Services – SCS Engineers

 

 

 

Posted by Diane Samuels at 6:00 am

September 13, 2016

For years, Wisconsin landfills have relied on compliance with the storm water (stormwater) management requirements in the Chapter NR 500 code series to achieve compliance with the NR 216 storm water standards. Effective June 15, 2016, the Wisconsin Department of Natural Resources (WDNR) changed their policy, and now requires landfills and associated non-commercial borrow sites to obtain separate industrial storm water permit coverage.

Read the SCS Engineers Technical Bulletin to determine what action you may be required to take and by what date.

  • September 19, 2016, submit a Notice of Intent (NOI) form to WDNR.
  • WDNR will review your NOI and determine if your facility can be covered under the Tier 2 Industrial Storm Water Permit.
  • January 31, 2017, submit a Storm Water Pollution Prevention Plan (SWPPP) Summary Form. This also requires preparation of a SWPPP report designed to prevent storm water discharges of pollutants to waters of the state.

If you have questions or need help filing or developing a plan, please contact:

Betsy Powers, PE

(608) 216-7347

Sherren Clark, PE, PG

(608) 216-7323

 

Posted by Diane Samuels at 6:00 am