ARM

January 20, 2020

Do Tracer Environmental professionals ever slow down? The SCS Tracer professionals at SCS Engineers were busy publishing new articles last month in addition to Operator Training. We’ve compiled several of them along with the most popular in our SCS library for your convenience. Select a title and start reading. Enjoy!

How to Properly Complete an IIAR 6 System Safety Inspection Checklist Form?  When filling out the ANSI/IIAR 6-2019 Ammonia Refrigeration Safety Inspection Checklists, located in appendix B, some of the information required may not always be readily accessible. This comprehensive article takes readers step-by-step through the process.

Epic Fails, Part Deux    Failures that come together, form a picture. The author discusses how we can begin to learn from these Epic Fails and start to take steps to prevent them in our plants.

Ammonia Pipe and Equipment Labeling – Part I   Recognized and Generally Accepted Good Engineering Practices (RAGEGEP), an overview of many of the standards and guidelines that are relevant to the ammonia refrigeration system labeling, and guidance on how to apply them.

Ammonia Pipe and Equipment Labeling – Part II    Options facilities have when choosing their RAGAGEP for pipe and equipment labeling.

It’s All in Your Past, RETA Breeze    Investing in the knowledge and development of your personnel is the first step towards making your management system world-class in the safe operation and maintenance of your ammonia refrigeration system.

Employee Training Under PSM/RMP   FAQs about designing a training program that is part of your facility’s PSM and RMP programs and provides a defensible position during inspections while ensuring that your facility operators and maintainers perform their jobs safely.

Mechanical Integrity, Documentation Discrepancies    Checks, and verification prevent big problems.

Managing Organizational Change: How it Impacts Your Ammonia Refrigeration System During periods of organizational change, we must keep in mind the potential impacts on our facility’s PSM/RMP or ARM programs, and on the operation of the ammonia refrigeration system itself.

PSM/RMP Compliance Audits: Who Should Perform Them?   What to look for in an auditor for hire? For starters, more than a consultant familiar with PSM/RMP regulations.

Management of Change: Have We Captured All of the Impacts of a Change?   It is vital to ask as many questions as possible regarding equipment changes under consideration. With more information, you may find that the proposed changes could impact safety.

 

 

 

 

 

 

 

 

 

Posted by Diane Samuels at 6:01 am

January 28, 2019

Reflection, as a means of self-evaluation of the robustness of your refrigeration management system, is critical to the continuing success of your program.

Proper planning is another vital element of your program. Together, they will help ensure the continuing safety of you, your employees, and the public.

Bill Lape, a Certified Industrial Refrigeration Operator and a member of the National
Board of Directors of RETA is a Project Director for SCS Engineers.  In his most recent article,  Bill provides advice to use January and early February as a time of reflection and a planning period. We need to look closely at our ammonia refrigeration management programs, be they Process Safety Management (PSM) / Risk Management Plan (RMP) or Ammonia Refrigeration Management (ARM) for facilities with less than 10,000 pounds of
ammonia in their process.

Click to read the article, and thank you for interest in maintaining safety standards.

Process Safety Management,  Risk Managment Plans, Ammonia Refrigeration Management information.

 

 

 

 

 

Posted by Diane Samuels at 6:00 am