The Dry Creek Landfill LFG-to-Energy (LFGE) project employs two Caterpillar 3520 engine-generators. The plant has a capacity of 3.2 megawatts. The plant began operation in September 2007.
The range of services provided by SCS on this project include:
Process engineering
Supply and installation of engine/generators and all associated electrical switchgear
Design and installation of all other mechanical equipment and piping
Design and installation of all electrical work
Design and construction of all civil, structural and site work
Design and supply of prefabricated metal building
Design and installation of a plantwide SCADA system using SCS’s proprietary Internet-based iSCADA technology
SCS performed this work on a turnkey basis and is responsible for operation and maintenance of the facility under a multi-year contract.
SCS Engineers’ responsibilities: