MSW Landfills EG Comment Period Ends October 7, 2019

August 22, 2019

 

EPA 40 CFR Part 62

 

This proposed MSW Landfills Federal Plan includes the same elements as required for a state plan: identification of legal authority and mechanisms for implementation; inventory of designated facilities; emissions inventory; emission limits; compliance schedules; a process for the EPA or state review of design plans for site-specific gas collection and control systems (GCCS); testing, monitoring, reporting and record-keeping requirements; public hearing requirements; and progress reporting requirements. Additionally, this action summarizes implementation and delegation of authority of the MSW Landfills Federal Plan.

This proposed action addresses existing MSW landfills and associated solid waste management programs. For the purpose of this regulation, existing MSW landfills are those that accepted waste after November 8, 1987, and commenced construction on or before July 17, 2014.

Tables 1 and 2 in the publication list the associated regulated industrial source categories that are the subject of this action and the status of state plans. The EPA tables are not intended to be exhaustive but do provide a guide for readers regarding the entities that this proposed action is likely to affect. The proposed standards, once promulgated, will be directly applicable to the designated facilities.

The document contains the full text and how/when to comment or appear at the public hearing. Feel free to share this document or page with others using the icons at left.

EPA-HQ-OAR-2019-0338-0001_August_22_2019

 

Contact SCS Engineers

 

 

 

 

 

Posted by Diane Samuels at 11:53 am